You import a spreadsheet and all the rows show up. Which row would you trust with a records decision?
An import can reproduce a source problem perfectly. If the original text, approved correction, and reason for the change become disconnected, someone may use a value that never represented the governing rule. An AI assistant may explain that value clearly and still give the wrong retention answer.
Under 36 CFR § 1225.10, federal records must be covered by approved disposition authority. NARA provides both the issued General Records Schedules and a machine-implementable version. Keep the published schedule available when interpreting the imported data.
Stage the import and read it back
Save the original file with its transmittal, download date, source link, and checksum. Preserve raw values as text where spreadsheet interpretation could change them. Import into a SharePoint staging list, then compare the list against the file. GovKM’s Transmittal 37 import recorded 322 rows and a comparison of 4,508 mapped values. That establishes the fidelity of the import. It also preserves the source discrepancies that the reviewer needs to see.
For example, the CSV repeated GRS 4.5.010. The published GRS 4.5 distinguishes items 010 and 011 by their disposition authorities. Another row contained 7-Apr in the retention field for item 060 of GRS 2.3. NARA’s GRS 2.3 FAQ explains the four-to-seven-year window and the need to identify the appropriate period. Preserve the source value, document the correction beside it, and keep unreviewed entries out of automation.
Rehearse a transmittal change
Select one changed schedule item. Ask a second reviewer to find both versions, explain the difference, and show which local mappings it affects. Have the reviewer identify which decisions were made under the earlier version. That is the point of keeping the import history.
A bank can use the same method for a regulator’s revised retention schedule or an approved internal policy catalog, applying its own authorities. GovKM proposes using OrgAI to trace the source and version behind a records decision and surface unresolved conflicts for review. The next article builds the document fields that connect records to this authority.
Ask GovKM to assess your schedule import and reconciliation process.
GovKM’s SharePoint Online walkthrough
Part 3 of 8