GovKM Proposed Standards and Guidance
Keep Meaning and Controls Intact Across Systems
Plan and verify information exchanges so sources, versions, dates, references and required controls remain usable.
GovKM-proposed public draft. Published for public review. Not externally accredited or endorsed.
View the EICARS framework resourceDocument
Return to the EICARS guidance index
EICARS implementation guidance — proposed public draft. Checklist coverage: R07.1, R07.2, R07.3, R07.4. Prepared November 9, 2026. These suggested approaches support the published GovKM-proposed EICARS v0.1 draft; they do not add requirements or grant external accreditation.
Purpose and use
Plan and verify information exchanges so sources, versions, dates, references and required controls remain usable.
Use this guide within a declared organizational scope, with existing repositories and suitable organizational processes. AI is optional. Examples and suggested evidence are implementation aids; the published standard governs a conformance assessment. The Riverton case below is fictional, not an observed deployment or test result.
Responsible roles
Enterprise architecture, system and integration owners, with business, records and security acceptance.
Assign responsibilities through the organization’s actual instruments. A suggested role in this guide does not itself confer decision authority.
R07.1 Document cross-system exchanges
Suggested approach: Document the information that must survive each participating exchange: identity and version, meaning, dates, approvals, references, access restrictions and lifecycle context where relevant. Map existing fields and identify which system enforces each control. An export specification should describe business meaning as well as file structure.
Riverton example: Riverton’s project view references inspection and IT sources. The mapping explains which dates are assessment dates and which office owns approval, rather than treating similarly named fields as interchangeable.
Evidence and completion check: Retain the mapping and owner approval. Walk through one exchange and explain how an authorized recipient interprets every material field and control.
R07.2 Provide usable export or exchange
Suggested approach: Provide a documented, usable way to exchange or export necessary information and context. Prefer documented open formats where suitable, while meeting preservation and security needs. Check that the route is actually available under the organization’s configuration and permissions. A flat file may be adequate for a small register but inadequate for complex records.
Riverton example: Riverton can export the briefing’s reference list and retrieve the required source revisions through controlled routes. It does not assume a PDF export preserves all original formulas or history.
Evidence and completion check: Demonstrate the exchange with representative approved material. Retain format and access instructions, dependencies and a description of information that the route cannot carry.
R07.3 Verify exchanges and migrations
Suggested approach: Test representative exchanges or migrations against expected business outcomes agreed in advance. Include versions, attachments, dates, references, permissions and lifecycle requirements that matter to the destination use. Reconcile the transferred population and investigate omissions. A successful file transfer is only one part of acceptance.
Riverton example: Riverton moves an approved test inspection file and checks that the correct revision remains locatable, the reference works and an unauthorized user remains denied access.
Evidence and completion check: Keep the test population, expected outcomes, source-to-target observations, exceptions and acceptance decision. Include negative access checks without using real protected personnel data.
R07.4 Identify exchange losses
Suggested approach: Record unsupported fields, degraded content and control losses in an exchange exception record. Identify the dependent uses affected, assign remediation and obtain responsible acceptance where permitted. Do not claim a requirement is satisfied merely because the organization accepts a risk. Keep the existing source authoritative when appropriate.
Riverton example: An export omits Riverton approval evidence. Staff retain the source and limit the receiving view until the approval reference is available; they do not present the export alone as an approved report.
Evidence and completion check: Show one exchange limitation and its treatment. Verify a correction before dependent use, or document that the affected use remains restricted and the requirement remains not demonstrated.
Evidence and completion checks
Agree the population, expected results and acceptance conditions before assessing. Record the date, assessor, evidence reference, observed result and limitation. Use approved safe examples for access, malicious-content or lifecycle tests. Documented policy and observed operating behavior are both relevant; one does not automatically prove the other.
On smaller screens, scroll the table horizontally to view every column.
| Item | Suggested evidence and demonstration |
|---|---|
| R07.1 | Retain the mapping and owner approval. Walk through one exchange and explain how an authorized recipient interprets every material field and control. |
| R07.2 | Demonstrate the exchange with representative approved material. Retain format and access instructions, dependencies and a description of information that the route cannot carry. |
| R07.3 | Keep the test population, expected outcomes, source-to-target observations, exceptions and acceptance decision. Include negative access checks without using real protected personnel data. |
| R07.4 | Show one exchange limitation and its treatment. Verify a correction before dependent use, or document that the affected use remains restricted and the requirement remains not demonstrated. |
Record a gap where the required outcome is not demonstrated. Assign an owner and review date, then verify any correction. Completion of this page alone does not demonstrate conformance with all ten domains, certify legal compliance, approve an AI deployment or authorize autonomous actions.
Common mistakes
Accepting file counts as proof of fidelity; silently dropping approval fields; assuming destination permissions match the source.
Continue the checklist
Use this page with the EICARS standard, the identity guide and the full Riverton scenario. No particular product, model or repository migration is required.
Implementation overview
Suggested operating approach: assign the responsible roles, confirm applicability, implement suitable controls in the existing environment, examine operating evidence and track unresolved gaps. Tailor the methods to scale and risk. Maintain current services during preparation and preserve records, access and legal obligations throughout.
Standards traceability and references
Version history
November 9, 2026 — Publication authorized by GovKM. Guidance based on checklist and government authority reference package checked November 5, 2026. References must be periodically revalidated.
November 9, 2026 — Expanded implementation guidance, version 0.1. Replaced the shorter implementation text with the reviewed Riverton examples, task-specific approaches, evidence checks and official authority mappings, with Robert Noyes’s approval. Existing URLs and checklist anchors are preserved. No EICARS requirement or GovKM doctrine is amended.